Repair work has begun on the Bayside Trail. Fences have been set up at the top of Battery Humphreys road (With unlocked gate for authorized vehicles only), and at the trailhead. Navy personnel will still be allowed access to Battery Humphreys.
Construction is expected to continue through 1/15/15, and depending on weather could be extended.
As a reminder, the Bayside Trail is a signed construction site, and as per OSHA regulations, unauthorized persons are precluded from entry.
Thanks for your understanding as we proceed with this project.