Out With The Old, In With The New

New waysides are continuing to be installed around Cabrillo. The latest waysides have been installed down at the Tidepools. Three out of four have been completed, including one wayside showing views of high and low tide. VIPs Joel, Bob and Dan have been assisting Ranger George in installing the new waysides. When we had a lot of concrete work to do, we brought Rangers Rudy and Matt to help with the fun.

New post and rope will be installed soon narrowing the path to the tidepools. This will help keep visitors away from the cliff edge and allow vegetation to recover.

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.